chore(deps): update docker docker tag to v29 #40

Merged
nyyu merged 1 commit from renovate/docker-29.x into master 2025-11-11 07:55:58 +01:00
Collaborator

This PR contains the following updates:

Package Update Change
docker major 28.5.2-cli -> 29.0.0-cli

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Update | Change | |---|---|---| | docker | major | `28.5.2-cli` -> `29.0.0-cli` | --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied. ♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiI0Mi4yLjAiLCJ1cGRhdGVkSW5WZXIiOiI0Mi4yLjAiLCJ0YXJnZXRCcmFuY2giOiJtYXN0ZXIiLCJsYWJlbHMiOltdfQ==-->
chore(deps): update docker docker tag to v29
All checks were successful
ci/woodpecker/pr/woodpecker Pipeline was successful
ci/woodpecker/pull_request_metadata/woodpecker Pipeline was successful
ci/woodpecker/pull_request_closed/woodpecker Pipeline was successful
ci/woodpecker/push/woodpecker Pipeline was successful
d96fa5f496
nyyu merged commit d96fa5f496 into master 2025-11-11 07:55:58 +01:00
nyyu deleted branch renovate/docker-29.x 2025-11-11 07:55:58 +01:00
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
nyyu/monitoring!40
No description provided.