chore(deps): lock file maintenance #35

Merged
renovate-bot merged 1 commits from renovate/lock-file-maintenance into master 2024-07-08 00:10:52 +02:00
Collaborator

This PR contains the following updates:

Update Change
lockFileMaintenance All locks refreshed

🔧 This Pull Request updates lock files to use the latest dependency versions.


Configuration

📅 Schedule: Branch creation - "before 4am on monday" (UTC), Automerge - At any time (no schedule defined).

🚦 Automerge: Enabled.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

👻 Immortal: This PR will be recreated if closed unmerged. Get config help if that's undesired.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Update | Change | |---|---| | lockFileMaintenance | All locks refreshed | 🔧 This Pull Request updates lock files to use the latest dependency versions. --- ### Configuration 📅 **Schedule**: Branch creation - "before 4am on monday" (UTC), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Enabled. ♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox. 👻 **Immortal**: This PR will be recreated if closed unmerged. Get [config help](https://github.com/renovate**redacted**/renovate/discussions) if that's undesired. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovate**redacted**/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIzNy40MjEuMiIsInVwZGF0ZWRJblZlciI6IjM3LjQyMS4yIiwidGFyZ2V0QnJhbmNoIjoibWFzdGVyIiwibGFiZWxzIjpbXX0=-->
renovate-bot added 1 commit 2024-07-08 00:10:43 +02:00
chore(deps): lock file maintenance
All checks were successful
ci/woodpecker/pr/mingw Pipeline was successful
ci/woodpecker/pr/linux Pipeline was successful
ci/woodpecker/pull_request_closed/mingw Pipeline was successful
ci/woodpecker/pull_request_closed/linux Pipeline was successful
ci/woodpecker/pr/test Pipeline was successful
ci/woodpecker/push/linux Pipeline was successful
ci/woodpecker/push/test Pipeline was successful
ci/woodpecker/push/mingw Pipeline was successful
0d6d21006f
renovate-bot scheduled this pull request to auto merge when all checks succeed 2024-07-08 00:10:43 +02:00
Author
Collaborator

Branch automerge failure

This PR was configured for branch automerge. However, this is not possible, so it has been raised as a PR instead.


  • Branch has one or more failed status checks
### Branch automerge failure This PR was configured for branch automerge. However, this is not possible, so it has been raised as a PR instead. ___ * Branch has one or more failed status checks
renovate-bot merged commit 0d6d21006f into master 2024-07-08 00:10:52 +02:00
First-time contributor

Quality Gate: OK

  • new_violations
    • Status: OK
    • Value: 0

See analysis details

## Quality Gate: **OK** * new_violations - Status: OK - Value: 0 [See analysis details](https://sonar.nyyu.dev/dashboard?id=dev.nyyu:cggitem_sets&pullRequest=35)
Sign in to join this conversation.
No reviewers
No Label
No Milestone
No Assignees
2 Participants
Notifications
Due Date
The due date is invalid or out of range. Please use the format 'yyyy-mm-dd'.

No due date set.

Dependencies

No dependencies set.

Reference: nyyu/CGGItemSets#35
No description provided.